NYC Post-Construction Cleaning for Furnished Homes and Apartments

Final-stage renovation cleaning for fully furnished apartments and private houses in NYC. Since 2009 - over 25,000 jobs completed, $1,000,000 liability insurance, W2 team.
Including Offices, Factories, Kitchens, and Rental Properties

What Makes Post-Construction Cleaning Different

Post Construction Cleaning NYC

After renovation, dust doesn’t just sit on surfaces — it settles into furniture seams, cabinet interiors, window tracks, and HVAC vents. Standard cleaning doesn’t reach it. Post-construction cleaning requires a specific sequence: dry removal first, then wet cleaning, zone by zone, with the right equipment for construction residue.

At Cleaning Laboratory, we’ve handled post-renovation jobs in NYC since 2009 — from single-bathroom apartment refreshes to full private house cleanouts across multiple floors. Our team brings HEPA-filter vacuums, eco-certified products, and a room-by-room checklist developed from 15+ years of real post-construction experience.

  • All construction work must be fully completed at least 3 days before cleaning begins — so dust settles properly and one visit is enough.
  • No contractors on-site during cleaning. Parallel work means dust continues to settle, requiring additional visits billed separately.
  • W2 employees, not contractors. All 25 cleaners are background-checked, reference-verified, and trained before their first solo assignment.
  • $1,000,000 liability insurance with A++ Superior rating. Furniture, surfaces, and fixtures are covered.

Schedule an our service in just three simple steps.

choose a service
Select Cleaning Service

Let us know your cleaning needs. We'll provide you with the most competitive pricing available.

choose cleaning time
Arrange Cleaning Appointment

Let the manager know the time of day that works best for you and your cleaning schedule.

enjoy your home
Relish in a Sparkling Space

Now you can enjoy knowing that your space will be impeccably clean from floor to ceiling.

Our Guarantee

We work on a “first cleaning — then payment” basis. You’re charged only after the job is complete and you’ve confirmed the result.

If anything doesn’t meet the standard, we return within 24 hours at no charge. If damage occurs during cleaning, we respond within 1-5 hours and resolve compensation within 5 business days — backed by $1,000,000 liability insurance.

Our post-construction jobs carry a 98% first-time pass rate: fewer than 2 in 100 require a follow-up visit.

The owner of Cleaning Laboratory

Owner’s Expertise & Company Story

Cleaning Laboratory was founded in 2009 by Oksana Korpos, who came to New York with two degrees and nine years of teaching experience. Starting from scratch — no investors, no connections — she built a company around one principle: systematic work with documented results. Every cleaner goes through an internal training program before their first independent assignment. Post-construction jobs follow a room-by-room checklist refined over 15 years of NYC renovation projects.

What Our Happy Customers Say

What’s Included in Post-Construction Cleaning

This service is designed for fully furnished apartments and private houses where renovation is complete and furniture is present — typically covered with protective plastic film. Our team removes all protective materials, adhesive residue, and construction dust, then cleans every room zone by zone from ceiling to floor.

General Areas (All Rooms)

  • Cobwebs removed from ceilings, corners, and joints
  • Dry and wet dust removal from walls (reachable areas), corners, ledges, and architectural details
  • Baseboards, doors, door frames, door handles, and hardware wiped
  • All light fixtures dusted and wiped: chandeliers, ceiling lights, spotlights
  • Light switches and outlet covers wiped
  • Floors thoroughly vacuumed and wet-mopped (multiple passes where needed)

Furniture & Built-Ins

  • All protective plastic films removed from furniture, built-in units, and surfaces covered during construction
  • Adhesive tape and glue residue removed from furniture, doors, frames, and walls (where safe)
  • All furniture surfaces wiped after film removal
  • Every drawer, cabinet, and door opened; shelves, interiors, and sides wiped; dust removed from corners and joints
  • All cabinets and drawers left open after cleaning for ventilation and inspection

Windows & Window Sills

  • Window sills wiped (top, underside, edges)
  • Window frames and corners cleaned
  • Interior glass polished to a streak-free finish
  • Exterior glass cleaned when outdoor temperature is 41°F (5°C) or above; interior only if below

Kitchen

  • Protective films removed from cabinets, appliances, and panels; adhesive residue removed where safe
  • Cabinet exteriors and interiors cleaned; drawers cleaned inside and out
  • Countertops and backsplash cleaned and degreased
  • Oven checked and wiped inside; microwave wiped inside; refrigerator wiped inside and outside (if installed)
  • Sink and fixtures cleaned and polished
  • Floors vacuumed and mopped

Bathrooms

  • Protective films removed from fixtures and surfaces
  • Toilet cleaned and disinfected inside and out
  • Sink, countertop, shower, and bathtub walls cleaned and disinfected
  • Mirrors and glass cleaned streak-free
  • Cabinet interiors and shelves wiped
  • Exhaust fan cover wiped (exterior)
  • Tiles: dry and wet dust removal; floors vacuumed and mopped

Bedrooms / Living Areas / Additional Rooms

  • Plastic film removed from furniture and built-ins; tape and adhesive residue removed
  • All furniture surfaces, shelves, and cabinet interiors wiped
  • Switches, outlets, and handles cleaned
  • Walls dusted (reachable areas), corners and baseboards wiped
  • Floors thoroughly vacuumed and wet-mopped

Staircases & Multi-Level Areas (Private Houses)

  • Dust removed from stair walls, corners, and railings
  • Steps vacuumed and wet-mopped
  • Handrails wiped and polished
  • Landings and floor transitions cleaned

Final Result

  • Construction dust fully removed
  • All protective films and adhesive tape removed
  • Cabinets, drawers, and shelves cleaned inside and out
  • Staircases and all levels cleaned (private houses)
  • Glass and surfaces polished streak-free
  • Home ready for full use, move-in, or final handover

Frequently Asked Questions

We cover all five boroughs of New York City, which include Manhattan, The Bronx, Brooklyn, Queens, and Staten Island. We may also be able to service some parts of the surrounding areas. Please contact us for specific inquiries.

Our post-construction cleaning services include dusting, vacuuming, mopping, window cleaning, kitchen and bathroom sanitation, and debris removal. We also offer more specialized services such as floor polishing, grout cleaning, and high dusting.

The duration of post-construction cleaning depends on the size of the property and the level of cleaning required. A small residential property may take a day, while a large commercial property could take several days.

No, our team comes fully equipped with all the necessary cleaning supplies and state-of-the-art equipment to handle post-construction cleaning.

Scroll to Top
Contact us to book cleaning service